日韩精品久久一区二区三区_亚洲色图p_亚洲综合在线最大成人_国产中出在线观看_日韩免费_亚洲综合在线一区

USEUROPEAFRICAASIA 中文雙語(yǔ)Fran?ais
Home / World

Construction of petroleum reserves proceeding

By Wang Yu and Li Xiang | China Daily | Updated: 2011-07-23 08:07

TIANJIN - The construction of China's petroleum reserves is in full swing, with the capacity reaching a 36-day consumption level in the preliminary phase, said Li Shousheng, vice-chairman of China Petroleum and Chemical Industry Federation.

"China's petroleum strategic reserve is key to addressing the issues of the national economy and energy safety during the 12th Five-Year Plan period (2011-2015). There is a huge gap between the supply of, and demand for, energy. The energy safety problem would become very prominent if an emergency occurs," Li added.

Despite last year's record 200 million tons of oil output, oil consumption in China was as high as 440 million tons, more than 50 percent of which was imported from abroad.

Construction of petroleum reserves proceeding

Today's Top News

Editor's picks

Most Viewed

Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US